The funds generated enabled the club to continue development and maintenance works as follows:
- Works to Pitch2 goalmouth areas at a cost of +€35K – significant initial outlay but will avoid repeated works per annum.
- New fuse box and wiring to Club Pavilion €12K - was potential fire risk
- Replacement mower, replace damage to Pitch 3/4 Generator and repairs to P2 Generator = +€5K
- New pitch side viewing / handrails / pathway for Pitch 3. ~€27K
- Enhancing walkways, parking, signage and lighting around the pitches and dressing rooms ~€5K.
- New LED lighting for Pitch 2. Significant cost ~€125K which would require deposit for a loan
- Modernise our pavilion with new seating and general decorating/painting ~€5K.